Skip Navigation Links.
Collapse Issue 489:<br />2 Mar 2020<br />_____________Issue 489:
2 Mar 2020
_____________
Collapse  NEWS NEWS
Collapse  FORUM FORUM
Collapse  HEALTH HEALTH
Collapse  ARTS ARTS
Collapse  EDUCATION EDUCATION
Collapse  SPORT SPORT

Work starts on traffic measures in Memorial Ave

Work has started on a $1.65M project to improve traffic flow at the foot of Blackwall Mountain on Memorial Ave, Blackwall, between Wyalong Rd and Warwick St.

The work includes installing a central concrete median to restrict right turn movements at Warwick St, installing a right turn lane into Wallaby St, widening the road to accommodate the new turning lane and median, improving street lighting, and clearing and trimming vegetation to allow for the road widening.

Parliamentary Secretary for Central Coast Mr Adam Crouch said temporary traffic changes would be in place while the project is in progress, including a 40km/h speed limit.

"Memorial Avenue is the main road connecting Ettalong Beach to Woy Woy and this project consists of safety improvements to help reduce the number and severity of crashes," Mr Crouch said.

"This 350m stretch of road will be made smoother and safer for motorists by this road widening and installation of a new raised median strip."

Mr Crouch said there would be another six weeks of day work followed by three weeks of night work to complete the work.





Skip Navigation Links.

Skip Navigation Links.
     Phone 4342 5333     Email us. Copyright © 2020 The Peninsula's Own News Service Inc    PO Box 585 Woy Woy NSW 2256