Skip Navigation Links.
Collapse Issue 506:<br />02 Nov 2020<br />_____________Issue 506:
02 Nov 2020
_____________
Collapse  NEWS NEWS
Collapse  ARTS ARTS
Collapse  FORUM FORUM
Collapse  HEALTH HEALTH
Collapse  EDUCATION EDUCATION
Collapse  SPORT SPORT

Work proceeds on shopping centre carpark

Work is proceeding on the carpark at Deepwater Plaza.

Solar shade structures are being installed in the Coles car park, with resurfacing and line marking.

Improvements are also being made to the ground level of the multi-deck car park in George St.

Deepwater Plaza centre manager Ms Marcelle Proper said Stage One works were complete, with parking available between the Coles entrance and The Pavilion.

"Stage Two works are complete to three bays of the Coles car park, which are open and accessible for parking," she said.

"Works have commenced in the final bay and to the car spaces directly alongside the building of the shopping centre.

"Access to the centre remains open at all times," said Ms Proper.

"Alternative parking is available in the multi-deck carpark, located opposite Gloria Jeans."





Skip Navigation Links.

Skip Navigation Links.
     Phone 4342 5333     Email us. Copyright © 2020 The Peninsula's Own News Service Inc    PO Box 585 Woy Woy NSW 2256